Step 1. Drain the pool.
Step 2. Clean out the swimming pool, check the surface for any loose or delaminated surfaces and remove.
Step 3. Undercut the existing waterline tile by approximately 3 to 4 inches.
Step 4. Acid wash the pool with muratic acid.
Step 5. Apply 2-part Bond Kote to the entire pool surface.
Step 6. Apply Diamond Brite surface by hand trowel first with a scratch coat then a finish coat. One bag of Diamond Brite applied correctly will cover approximatly 22 square feet.
If you have any further questions about the application process. pleas fill out the contact us form and I will get back to you.
Contact Happy Pools.